 1. Excavation of pool begins. Galvanized steel panels are laid out prior to installation. |  2. Crews complete accurate excavation of pool bottom. Pool wall panel ledge is visible. |
 3. Steel wall panels have been installed and leveled. Steps are being completed. |  4. Steel wall panels have been installed and leveled. Steps are being completed. |
 5. Wall and step panels and wall braces are completed. Continuous concrete collar has been poured. |  New pool equuipment has been installed. New plumbing lines are being run to the pool. |
 7. New plumbing lines have been installed for main drains, returns and skimmer. |  8. Light niche and conduit has been installed. Backfill and compaction has begun. |
 9. Backfill has been completed. Concrete bottom has been troweled in. Deck coping forms are installed. |  10. Liner is being installed. Stamped concrete deck is complete. Slide is installed. Looks great ! |